1 / 21
Pool cover installed (along with previously missing hand rail)
2 / 21
Coping over cover almost done
3 / 21
KEEP CHILDREN AWAY, it says - sorry, Max :)
4 / 21
Keeping _everyone_ away for now, because they haven't given us the code yet
5 / 21
Final trim strips installed on Office cabinets
6 / 21
Final trim strips installed on Office cabinets
7 / 21
Arbor prepped for pressure washing and repainting
8 / 21
Driveway heating coils in place
9 / 21
Ramp to front door is heated as well
10 / 21
We're hoping to pour this section of concrete next week
11 / 21
Installation of heating system in Garage continues...
12 / 21
...along with the wiring for our electric car charger
13 / 21
Meanwhile, a number of healthy young gentlemen pushed _this_...
14 / 21
...around the house, into the dungeon door, down the Back Hall...
15 / 21
...and into the Arcade
16 / 21
Slight improvement over our current hot tub, which has SEVEN jets
17 / 21
This will soon be a frequent view
18 / 21
Front panel off to view the "innards"
19 / 21
Close-up of the electronics - also an improvement over the 1995 model
20 / 21
Dressing Room mirror in place
21 / 21
Exercise Room padded floor almost completed
❮
❯