1 / 18
Driveway prep work almost done...
2 / 18
...they're actually coming _tomorrow_ (Saturday!) morning to finish it
3 / 18
Garage radiant heat plumbing will be ready for next week's driveway setup
4 / 18
Count von Count found the two missing Office cabinet handles :)
5 / 18
Vertical blinds hung in the Living Room...
6 / 18
...electric shades in the Kitchen...
7 / 18
...and also next to the front door (yes, we'll hide the wires)
8 / 18
Bedroom 4 is ready for visitors (hi, Glitter Girls!)
9 / 18
Bedroom 2 wall hanging and headboard and lamps are also ready
10 / 18
Exercise Room floor mats will be installed soon
11 / 18
We don't know where this cast iron pipe goes, so we're re-routing around it
12 / 18
Polaris pump for the Pool unpacked
13 / 18
Bathroom 4 "Pool lockers" assembled and in place
14 / 18
Bathroom 4 "Pool lockers" assembled and in place
15 / 18
Master Bedroom headboard prepared...
16 / 18
...and installed
17 / 18
Bob suggests the protector dragon should be mounted _here_
18 / 18
Lanai table for 12 unpacked and assembled and ready for brown paper and crabs :D
❮
❯