1 / 21
New trim around front windows
2 / 21
Inside of the Back Hall "dungeon door" now matches the outside
3 / 21
During the "lockout", we went shopping - here's the fire pit we ordered for the Screened-In Porch...
4 / 21
...along with this table and chairs
5 / 21
New electrical box for the Pool Maintenance Room
6 / 21
Struts for Screened-In Porch are on site
7 / 21
Struts for Screened-In Porch are on site
8 / 21
Struts for Screened-In Porch are on site
9 / 21
Last section of old siding (next to front door) replaced
10 / 21
Garage window has new trim
11 / 21
Electric oven ready to be installed in Kitchen island
12 / 21
Temporary toilet ready to be installed in Bathroom 5 (hi, Gail!)
13 / 21
Why we were "locked out": insulation installation! Master Bedroom wall
14 / 21
Insulation in Master Bedroom wall and rafters
15 / 21
Insulation in Arcade
16 / 21
Soundproofing in Arcade
17 / 21
Insulation in Pool house rafters
18 / 21
Insulation in Bathroom 4
19 / 21
Towel and TP holders in Bathroom 2...
20 / 21
...and Bathroom 3
21 / 21
Basement computer rack now has a light show :D
❮
❯