May 26

1 / 18
I-beams in place - framing starts next week
2 / 18
...well, all except that _one_ at the far end... :)
3 / 18
Pool area stone in, and pool decked for framing
4 / 18
Pool area stone in, and pool decked for framing
5 / 18
Stone in for Patio, with Screened-In Porch in progress
6 / 18
...and completed (Bob works FAST)
7 / 18
Ramp from Dressing Room to Pool stoned in
8 / 18
If there's anything Bob loves more than playing in dirt and stone...
9 / 18
...we haven't found it yet :D
10 / 18
Garage (love that floor!)...
11 / 18
Garage (love that floor!)...
12 / 18
...is overflowing with doors and windows
13 / 18
...is overflowing with doors and windows
14 / 18
...is overflowing with doors and windows
15 / 18
All the trim is here...
16 / 18
...along with (almost) all the doors
17 / 18
Redoing the Bathroom 3 floor (levelled the wrong way)
18 / 18
Inspector said we needed more outlets in the Kitchen